In reference to the two cars mentioned in scraphauler's last post, they pulled the whole rail train from Honda, pushed those two cars and the gondola into the siding behind (former) Greensburg Milling, pushed the rest of the rail train onto the track going to Lowe's, then grabbed those two cars and pushed them back out to Honda. All this just to get that one gondola (or so that they could leave those two cars). Luckily, diesel fuel is cheap

Security guy says earth moving at Honda will go to one shift on June 15th.
There are a few construction projects that I was wondering about (had not seen them in any of the plans). Anybody know what they are building here:
1. The big excavation just south of I74 and west of Moscow Rd.
2. Where 421 is being kinked to the west to accomodate the new interchange, it looked like they were putting in foundations for a building inside the kink, just northwest of the last building (when heading northwest) on the southwest side of 421.
3. Between 421 and I74, north of where they are building the new bridge across the interstate and just south of the water tower. Almost looked like they were grading for building.
The wrong way to move a transformer:
http://www.railroadforums.com/forum/showthread.php?t=18557